Southgate Steeplejacks Logo

(802) 839-6099 • 279 Websterville Road, Barre VT 05641 • jay@southgatesteeplejacks.com

 

   Steeple picture
Home Portfolio Under Construction Steeple Anatomy Technical Details About Us

Brandon VT

 

Painting trim.

Painting trim.

 

Assembling interior structural framwork.

Assembling interior structural framwork.

Installing sheething to spire

Installing sheething to spire
Using a crane to load steeple onto a flatbed for Preparing lantern section for siding.
Using a crane to load steeple onto a flatbed for
transport to site.
Preparing lantern section for siding.

Steeple is on site and prepared for installation

Steeple is on site and prepared for installation

Steeple loaded and ready for transport.

Steeple loaded and ready for transport.

Church belfry being repaired and made ready

Finished lantern and spire being installed on belfry.

Church belfry being repaired and made ready
for lantern and spire.

Job complete!

Finished lantern and spire being installed on belfry.
 
Job complete!